|
The next step for the foundation, and building site as a whole is the back-fill process.
Additional grading takes place at this point, as
the foundation is filled with packed soil and the edged
of the house are built up to allow even better water
drainage from the foundation area. This process took
only a few hours and the results are quite apparent, as
the entire site looks larger and more level.
|