|
The
initial rough in for the plumbing begins once the
foundation is back-filled.
Trenches for the water and sewer lines are dug in
the soil and the pipes are laid in place in their rough
position.
Once the pipes are in place, gravel is poured in
the form as a base for water to drain away.
The gravel is covered with thick plastic as a
vapor barrier and the foundation is now ready for
concrete.
|