The framing process is remarkably quick with panelized
construction.
As you can see from the photo examples, the first floor
is erected in a single day by a small team of workers.
Since Ryland sells many copies of their floor
plans in different communities, they can built most of
the frame in house at their factory and the end result
is a sturdy, well constructed and easy to assemble
structure.
The crews utilize pneumatic nail guns to quickly
bind all of the materials together.
Each section of the first floor frame fits
together well and you get an immediate idea of the
actual, physical layout of the house.
The interior walls are also panels that are
secured to the floor and the exterior walls in rapid
fashion.
The 2x4 construction for this floor plan features nine
foot walls, as well as numerous windows, all cut out of
the OSB and headed with the joists.
|