The second day of framing sees the “rim board” for the
second floor installed.
The second floor is constructed by a series of
“joists” or long I-beams made from Engineered wood and
OSB, connected to the outside walls and load bearing
members that carry the weight of the house.
The entire floor is between the ceiling of the
first floor and second is quite thick and will contain
the pipes, ducts and wiring for the first floor ceiling
and the second floor.
These joists are then covered in sub-flooring
made of OSB to make a stable platform for the second
floor of the house.
Temporary steps are installed so that the work
crews can easily access the new second floor.
|