The breaker box’s breakers are installed on day 64, with
circuits connecting
to all parts of the house. Our breaker box, by Square D,
has a thin profile that mounted easily between the wall
studs and flush into the wall of the garage.
All of the circuit breakers are well marked and
the main breaker is easily accessible.
The electrical meter is directly on the other
side of the wall from the break box.
On the other end of the wire, the outlets and light
switches and wired according to plan, mounted and cover
plates are put in place.
Each gang box was previously roughed in during
framing, with the electricians pre-stripping the wires
and cutting them to length.
This small step saved quite a bit of time for the
follow up electricians when the finished wiring was
completed.
|